Agile Software Project Management Methodologies
Successfully project planning, coordinating and controlling in order to deal effectively with
projects sponsors, customers, unexpected risks and changing scope are difficult tasks even for
the most experienced project managers. Different surveys indicated that about half of the
software projects were considered total failures and only a few of them were successful. The
tight deadlines, volatile requirements and emerging technologies are the main reasons for
this lake of performance. This agile project environment requires an agile project management.
The main characteristics of the agile software project management
approaches are: MSF for Agile Software Development, Extreme Programming, Scrum,
Crystal, Feature Driven Development, DSDM.
The agile approach started in 1994 with some
trials of semi-formal agile methodologies,
such as RAD, DSDM, XP, Crystal, Scrum.
These methodologies are based on agile
methods. Agile methods are adaptive rather
than predictive. Engineering methods tend to
try to plan out a large part of the software
process in great detail for a long span of
time, this works well until things change. So
their nature is to resist change. The agile
methods, however, are waiting for change.
Agile methods are people-oriented rather
than process-oriented. The goal of engineering
methods is to define a process that will
work well whoever happens to be using it.
Agile methods assert that no process will
ever make up the skill of the development
team, so the role of a process is to support the
development team in their work.
The declaration of principles and values in
the agile approach is known as the Agile
Software Development Manifesto, launched
in 2001, after a two day workshop at Snowbird
Utah (figure 3). A non-profit organization
the Agile Alliance was set up to promote
knowledge and discussion of all the agile
methods.
Applying these principles creates the foundation
for managing IT projects in an agile approach.
The basic characteristics of this approach
are the following:
• Assume simplicity. As the project evolves
it should be assumed that the simplest solution
is the best solution. Overbuilding the
system or any artifact of the project must be
avoided.
• Embrace change. Since The stakeholder
understanding of the requirements will
change over time. Project stakeholders themselves
may change as the project makes progress.
Project stakeholders may change their
point of view, which in turn will change the
goals and success criteria of the project management
effort.
• Incremental change – the pressure to get it
right the first time can overwhelm the best
project manager. Instead of futilely trying to
develop an all encompassing project plan
from the start, put a stake in the ground by
developing a small portion of the system, or
even a high–level model of a larger portion
of the system, and evolves this portion over
time. Or simply discard it when you no
longer need it in an incremental manner.
• Maximize stakeholder value. The project
stakeholders are investing resources (time,
money, facilities) to have a system deployed
that meets their needs. Stakeholders expect
that their investment to be applied in the best
way.
• Manage with a purpose Identify a valid
purpose for creating the artifact and the audience
for that artifact. This principle also applies
to a change to existing artifacts.
• Rapid feedback. The time between an action
and the feedback on that action must be
minimized. Work closely with the stakeholders,
to understand the requirements, to
analyze those requirements, and develop an
actionable plan, which provides numerous
opportunities for feedback.
• Working software is the primary goal of
the project. The goal of any software project
is to produce software that meets the needs of
the project stakeholders. The goal is not to
produce extraneous documentation, management
artifacts or models of these artifacts.